black88coupe
Club Member
Got underneath my car today and degreased and wire wheeled the rear half. Welded up my upper and lower torque boxes good and solid. I had them done awhile back but it was a bit of a rush job and they did them with the control arms still on the car. With the rear axle out this was a perfect oppurtunity to get in there and really finish them off the way i wanted them done. I also discovered and welded up one small crack that was forming in the pass. side lower torque box. I also installed the rear mounting plates for my Steeda subframe connectors. That should also help the lower torque boxes as they help to tie everything together in that area. I had to cut out one small rusted patch in the spare tire well and replace it with fresh metal. I POR-15'd all the areas that had rust. Once that dries i'll mist coat it with some undercoating. That should take care of any and all rust issues with the rear of the car. Whew, what a busy day! I'll post some pic's soon.
Last edited: