QuickLX
Club Member
Thanks guys!!!!!!
I have been working on it very slowly this winter and have made a good bit of progress. Here are the things that have gotten done:
1. EFI wiring is in the car
2. Fuel pump brackets fabbed up and in the car
3. Shifter wiring completed
4. Trans cooler lines made
5. Throttle cable bracket fabbed and ready to install
6. new electronics panel designed, built and and almost ready to be bolted into the glove-box area
7. Oil pan modified for the block it did not want to fit
8. cam installed, degree'd, & PTV verified
9. Heads assembled
Stuff left to be done:
1. Finish assembly of long block (this weekend)
2. Install electronics panel (this weekend)
3. install AMS 1000 (hoping to have it here in a week or so)
4. install engine, trans, and driveshaft
5. Finish fuel lines on engine
6. etc
7. etc
8 etc
I'll post up more pics soon.
I have been working on it very slowly this winter and have made a good bit of progress. Here are the things that have gotten done:
1. EFI wiring is in the car
2. Fuel pump brackets fabbed up and in the car
3. Shifter wiring completed
4. Trans cooler lines made
5. Throttle cable bracket fabbed and ready to install
6. new electronics panel designed, built and and almost ready to be bolted into the glove-box area
7. Oil pan modified for the block it did not want to fit
8. cam installed, degree'd, & PTV verified
9. Heads assembled
Stuff left to be done:
1. Finish assembly of long block (this weekend)
2. Install electronics panel (this weekend)
3. install AMS 1000 (hoping to have it here in a week or so)
4. install engine, trans, and driveshaft
5. Finish fuel lines on engine
6. etc
7. etc
8 etc
I'll post up more pics soon.