'87 notch project

intake is almost done... got 4 hours into it tonight. still probly 2 more to go. heads are ready to put together, but, waiting on parts from summit.
 
frame rails welded up and started on the torque boxes. should have em done tonight. i need to since i will be ready to put the rear back under it to see if the tires are going to clear on sunday... if not i will need to find a 28x10.50 for a little while...
 
update!
P8080203.jpg

P8080202.jpg

P8080201.jpg

P8080200.jpg

P8080199.jpg

P8080198.jpg

still have to weld up the lower torque boxes and lower floor plates and add two tubes to the cage
 
Last edited:
rear floor done, rear fire wall done, dash done and covered, fuse box made up, rear wires ran, lower torque boxes done, drivers seat ready to mount. just have to drill the new holes for the passenger seat, make the rear seat deleat, cover the rear fire wall and start installing the interior!!! might even get glass backe in the car in the next couple of weeks. have to check the pistion to valve clearence and if its good assemble the heads with the tfs springs and motor is done... ready to run...
 
picking up the tube to mount my rear coilovers and aluminum to make the rear wing later today. hopeing to get some airbrush work done on the engine comparment and fuel lines started to be ran today alnog with carpeting the rear firewall, deck, and wheel tubs.
 
motor is done except the rockers... trans is ready to go. hopefully it will be a roller this weekend again so i can put the motor in next week.
 
Back
Top