83 Capri RS Project

Dash is almost done just some final fit and finish. Heater core blower and defrost ducting back in place eliminated the A/C. I also picked up a C-6 a couple weeks ago it's at the Trans shop getting a little rebuild. Hoping to get it together and ready to run by the end of October.:headscrat
Photo-0508.jpg
 
Looks like it's coming along.

Yeah a little slower than I would like but $$$$$$ slows things down. waiting on the engine and tranny from the builder.
Won't be long now.:thumbsup::thumbsup:

Thanks
It will be dog ugly and running a stock suspension but it should be running and driveable by the end of Oct. Roll Cage and subframe connectors are being permanatley welded up this week, Over winter it is getting its final body work and paint and new suspension with a 5 lug conversion 9" rearend(4:10) Tubular K-member, A-arms & coil over conversion etc. etc. etc......
 
Back
Top