89 SBC Notch Project

turbododgeglh

Club Member
well i got some work done on the mustang today the short block is 85% complete just have to install the cam

355 SBC
Stock 4 Bolt Main Block
Eagle Rods
Compstar Crank
Holly Competition Carb Done By The Carb Shop
Diamond Pistons
Comp NOS Cam
Super Victor Intake
MSD 6AL
MSD Distributor
NOS Plate Kit
Comp 1.5 Rockers
GM Camel Hump Heads Bigger Valves And Lots Of Port Work
TCI 4000 Stall
Powerglide Trans With Brake
AJE K Member
Dynatech Longtubes

I have about 75% of the parts and i cant wait to get it on the road
alot of u have seen the car it was Casper302's old roller


l_02cc173573c74c15af55cf965bbc1e9e.jpg


DSC00074.jpg


DSC00100.jpg


DSC00102.jpg




and yes that oil pan will be powder coated black
 
Looks good man dont paint that bitch looks mean flat black I had a few hours in on that to get it done.Tint the windows limo and its good to go!!!!!!!!!!!!!
 
Back
Top